Available on working days between 9:00 am to 6:00 pm
Email us: sales2@industriaxplc.com
Available 24/7 for inquiries and support
Description
Yokogawa CP703 Field Control Station (FCS)
The Yokogawa CP703, also cataloged as the CP701 Field Control Station, operates as a dedicated hardware component for executing control logic and managing analog/digital I/O within CENTUM CS 1000 systems. It handles data acquisition, signal processing, and real-time communication with Human Interface Stations (HIS) via VLnet.
Hardware Specifications
Parameter
Specification
Model Brand
Yokogawa CP703
Core Processor
R4300 Microprocessor
Internal Clock
75 MHz
External Clock
25 MHz
Memory
16 MB DRAM
Communication
VLnet, RS-232C
I/O Controller
H8S Microcontroller with Shared RAM
Redundancy Support
Dual-redundant configuration (bumpless transfer)
Status Indicators
Front-panel LEDs
Operating Temp
0 to 55 degC (standard industrial)
Power Consumption
10-15 W (typical, depending on configuration)
Weight
700 g
Dimensions
Standard FCS module form factor
Origin
Japan
Process Control Features
The CP703 supports channel-to-channel isolation to minimize cross-channel interference, ensuring accurate analog and digital signal processing. FOUNDATION Fieldbus and 4-20 mA HART loop protocols are supported for real-time process communication. Cold junction compensation (CJC) is implemented to correct thermocouple input errors across varying ambient temperatures.
Frequently Asked Questions
Q: Does the CP703 support hot-swapping of CPU modules? A: CPU modules are not designed for hot-swap; replacement requires a controlled shutdown or redundant module failover.
Q: What is the expected switchover delay in a dual-redundant configuration? A: The failover time is near instantaneous (<100 ms) under normal operating conditions, maintaining continuous control output.
Q: Can firmware upgrades be applied directly on the CP703 module? A: Firmware must be updated using Yokogawa’s supported software interface via VLnet or HIS connection; direct module flashing is not supported.
Field Installation Guidelines
Mount modules on standard Yokogawa FCS rack slots, ensuring proper orientation.
Ensure the VLnet communication cable is shielded and grounded to reduce EMI.
Maintain minimum spacing between modules to allow adequate airflow and heat dissipation.
Connect power and I/O lines according to the system’s wiring diagram; verify signal grounding continuity.
Follow ESD precautions when handling CPU and memory modules to prevent damage.