Over 100,000 PLC, DCS, Drive, TSI & MRO Parts In Stock Learn more

Yokogawa ABC11D Dual-Redundant Bus Converter

Yokogawa ABC11D Dual-Redundant Bus Converter

Product form

Yokogawa ABC11D Dual-Redundant Bus Converter The Yokogawa ABC11D-A2123, also cataloged as the ABC11D Dual-Redundant Bus Converter, operates as a dedicated... Read more

SKU: ABC11D
Country of origin: JAPAN

      100% Original and Authentic

    Do you need a large stock? Contact us.

      100% Brand New,Ready to ship

    Do you need a large stock? Contact us.

      Support Refund,7X24h Service

    Support Refund,7X24h Service , Contact us.

      Call us: +86 135 995 07613

    Available on working days between 9:00 am to 6:00 pm

      Email us: sales2@industriaxplc.com

    Available 24/7 for inquiries and support

    Description

    Yokogawa ABC11D Dual-Redundant Bus Converter

    The Yokogawa ABC11D-A2123, also cataloged as the ABC11D Dual-Redundant Bus Converter, operates as a dedicated hardware component for deterministic control network bridging within CENTUM VP and CENTUM CS 1000 distributed control systems.

    Hardware Specifications

    Parameter Specification
    Model Brand Yokogawa ABC11D
    Origin Japan
    Weight 4.2 kg
    Dimensions 482 mm x 310 mm x 133 mm
    Operating Temp 0 to 50 degC
    Power Consumption 110 W typical
    Redundancy Dual-redundant bus architecture
    Data Transmission Rate 1 Mbps (Fieldbus side), 10 to 100 Mbps (Control network side)
    Processor Status Output Contact open on CPU abnormality
    Contact Rating 30 V DC, 0.3 A max
    Power Supply Options 100-120 V AC, 220-240 V AC, 24 V DC (model dependent)
    Ambient Humidity 10% to 90% RH, non-condensing
    Corrosion Protection Optional ISA G3 conformal coating

    Fieldbus Protocol Integration and Channel Isolation

    The ABC11D supports FOUNDATION Fieldbus H1 and Profibus PA connectivity for integration with legacy field instrumentation. Channel-to-channel isolation is implemented to suppress ground loop currents and prevent cross-talk between redundant bus paths. Cold junction compensation is applied on connected analog input channels to maintain signal accuracy under variable ambient temperatures.

    Frequently Asked Questions

    Q: What is the hot-swap behavior during a redundant bus switchover?

    A: The module maintains active communication through the alternate bus path without interruption; no process downtime occurs.

    Q: Does firmware revision affect compatibility with existing CENTUM VP racks?

    A: Firmware must match the installed CENTUM VP base software version; mismatched revisions may block network initialization.

    Q: Are both power supply inputs required for full redundancy?

    A: Yes. Both AC or DC supply rails must be energized to sustain uninterrupted operation during a single supply failure.

    Field Installation Guidelines

    Mount the ABC11D in a standard 19-inch rack using supplied brackets. Ensure secure grounding of the rack frame to the facility earth bus. Route control network cables separately from power wiring to minimize EMI coupling. Maintain minimum bend radius of 50 mm for all shielded twisted-pair cabling. Verify shield continuity at both ends and connect shields to designated earth terminals.

    Specifications

    • Brand: Yokogawa

    Advantages

    • High reliability in industrial environments
    • Supports continuous operation
    • Compatible with major PLC/DCS systems

    Customer Reviews

    Be the first to write a review
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    Send us a message!

    Do you need a large stock? Contact us.

    Collections you may also like

    Recently viewed products

      Login

      Forgot your password?

      Don't have an account yet?
      Create account