Yokogawa ANB11D-215/BU2A/NDEL ESB Bus Node Unit
Configured for deterministic I/O expansion in Yokogawa CENTUM VP distributed control systems, the Yokogawa ANB11D-215/BU2A/NDEL, also cataloged as the ANB11D Dual-Redundant ESB Bus Node Unit, provides direct physical and electrical execution of field signal interfacing via high-speed Extended Serial Bus communication links.
Suffix Breakdown & Model Matrix
Code Segment
Option / Value
Description
Model
ANB11D
Dual-Redundant ESB Bus Node Unit
Power Supply
-2
220 - 240 V AC Power Supply
Power Supply Config
1
Dual-redundant power supply
Seat / Comm
5
Basic type, standard communication
Option 1
/BU2A
Base Unit for 19-inch Rack Mounting (Dual-redundant)
Option 2
/NDEL
No digital explosion protection / Standard labeling
Hardware Specifications
Parameter
Specification
Model Brand
Yokogawa ANB11D-215/BU2A/NDEL
Origin
Japan
Weight
Approx. 5.0 kg (fully loaded)
Dimensions
19-inch rack mount standard
Operating Temp
0 to 50 degC
Power Consumption
220 - 240 V AC, 50/60 Hz
I/O Capacity
Up to 8 I/O modules
Bus Type
ESB (Extended Serial Bus)
Process Control & DCS Instrumentation Integration
The unit supports 4-20 mA HART loop protocol compatibility when paired with appropriate analog input/output modules, enabling seamless integration into existing CENTUM VP architectures. Channel-to-channel isolation is implemented within supported I/O modules to prevent ground loop interference and maintain measurement integrity under high-electrical-noise field conditions. Cold junction compensation is applied in thermocouple input configurations to ensure accurate temperature referencing at the termination points.
Frequently Asked Questions
Q: Does the ANB11D support hot-swapping of I/O modules while the ESB bus is active?
A: Yes, provided the I/O module type supports online replacement and the control station firmware permits it; power must remain stable during the swap.
Q: What is the redundancy switchover behavior if one power supply fails?
A: The secondary power supply assumes load without interruption; bus communication and I/O scanning continue unaffected.
Q: Are there restrictions on mixing different I/O module firmware revisions in the same node unit?
A: Firmware revisions must be compatible with the installed ESB interface module version; mismatched revisions may cause initialization faults.
Field Installation Guidelines
Mount the base unit in a 19-inch rack with unobstructed airflow paths above and below. Use separate conduit runs for power and signal wiring to minimize electromagnetic coupling. Terminate cable shields at the rack ground bus using low-impedance connections. Verify all power supply phases are correctly phased before energizing dual-redundant units. Perform gap voltage validation only after mechanical installation and prior to commissioning field devices.
تحديد
rtl">
المزايا
موثوقية عالية في البيئات الصناعية
يدعم التشغيل المستمر، متوافق مع أنظمة PLC/DCS الرئيسية