Yokogawa AFV30D-S41262 Duplexed Field Control Unit The Yokogawa AFV30D-S41262, also cataloged as the AFV30D Duplexed Field Control Unit, operates as...
Baca selengkapnya
Dukungan Pengembalian Dana, Layanan 7X24jam, Hubungi kami .
Hubungi kami: +86 135 995 07613
Tersedia pada hari kerja antara pukul 09.00 hingga 18.00
Email kami: sales2@industriaxplc.com
Tersedia 24/7 untuk pertanyaan dan dukungan
Keterangan
Yokogawa AFV30D-S41262 Duplexed Field Control Unit
The Yokogawa AFV30D-S41262, also cataloged as the AFV30D Duplexed Field Control Unit, operates as a dedicated hardware component for deterministic regulatory and sequencing execution within CENTUM VP distributed control platforms.
Suffix Breakdown & Model Matrix
Code Segment
Definition
AFV30D
Duplexed Field Control Unit, Vnet/IP, FIO compatible, 19-inch rack mount
-S
Standard type for CP461 processor modules
4
Dual-redundant Vnet/IP interfaces and dual-redundant power supplies
1
Internal designation (fixed value)
2
220–240 V AC power supply voltage
6
ISA Standard G3 conformal coating, no explosion protection
2
Compatible with R6.01 or later firmware/software
Hardware Specifications
Parameter
Specification
Model Brand
Yokogawa AFV30D-S41262
Origin
Japan
Weight
8.0 kg
Dimensions
482.6 x 310 x 177 mm (W x D x H)
Operating Temp
0 to 50 degC
Power Consumption
230 VA
Processor
VR5532, 350 MHz
Main Memory
128 MB
Memory Backup
Battery-backed, up to 72 hours
Network Interface
Vnet/IP, 1 Gbps, dual-redundant
Node Unit Capacity
Up to 13 FIO expansion nodes
Status Contact Output
2 terminals (NC, C), 30 V DC, 0.3 A max
Power Input
220–240 V AC, 50/60 Hz
Mounting
19-inch rack-mountable
Cold Junction Compensation & 4-20 mA HART Loop Protocol
The AFV30D-S41262 executes cold junction compensation for connected thermocouple inputs to maintain accurate temperature conversion without external reference sources. HART protocol operates concurrently with 4-20 mA analog loops, allowing device diagnostics and parameter adjustments without interrupting control execution. Channel-to-channel isolation limits ground loop effects when interfacing multiple measurement points.
Frequently Asked Questions
Q: What is the processor switchover time in duplex mode?
A: Switchover completes in less than 10 ms with no change to control outputs.
Q: Can the unit operate with one power supply module removed?
A: Yes, but redundancy is lost until both modules are installed.
Q: Does firmware require manual loading after CPU replacement?
A: No, firmware synchronizes automatically from the active CPU to the replacement module.
Field Installation Guidelines
Mount the FCU into a grounded 19-inch rack with adequate clearance for airflow. Route power and signal cables in separate pathways to reduce electromagnetic interference. Terminate cable shields at the rack ground point only. Verify incoming AC voltage matches the 220–240 V AC rating before energizing. Ensure all Vnet/IP connectors are fully latched prior to system startup.