{"product_id":"honeywell-cv-rsc100-plantcruise-100-scada-points-redundancy-license","title":"Honeywell | CV-RSC100 | PlantCruise 100 SCADA Points Redundancy License","description":"\u003ch3\u003eOverview\u003c\/h3\u003e\n\u003cp\u003e\u003cspan\u003eThe \u003cstrong\u003eCV-RSC100\u003c\/strong\u003e from Honeywell is a redundancy expansion license designed to strengthen PlantCruise SCADA systems with 100 additional points configured for high availability. This solution ensures uninterrupted operation in mission-critical environments by enabling seamless failover within 300 milliseconds, safeguarding data integrity and system stability during server transitions or maintenance events.\u003c\/span\u003e\u003c\/p\u003e\n\u003ch3\u003eTechnical Specifications\u003c\/h3\u003e\n\u003cul class=\"list-paddingleft-2\"\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eModel Number:\u003c\/strong\u003e \u003cstrong\u003eCV-RSC100\u003c\/strong\u003e\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eManufacturer:\u003c\/strong\u003e Honeywell\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eProduct Type:\u003c\/strong\u003e PlantCruise SCADA Points Redundancy License\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eSystem Compatibility:\u003c\/strong\u003e PlantCruise DCS (requires CV-RBASE1 foundation)\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eCondition:\u003c\/strong\u003e Brand New\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eWeight:\u003c\/strong\u003e 0.15 kg\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eDimensions:\u003c\/strong\u003e 7 × 14 × 14.5 cm\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eHS Code:\u003c\/strong\u003e 8537101190\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eOrigin:\u003c\/strong\u003e USA\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eLead Time:\u003c\/strong\u003e In Stock\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eMinimum Order Quantity (MOQ):\u003c\/strong\u003e 1\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eStatus:\u003c\/strong\u003e Active\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003ePerformance Characteristics\u003c\/h3\u003e\n\u003cul class=\"list-paddingleft-2\"\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eAdds 100 SCADA points with redundancy capability.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eFailover response time: \u0026lt; 300 ms.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eCPU Load Impact: ~3% per 100 points.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eRecommended Hardware: 32 GB RAM (64 GB optimal), 1 TB SSD with RAID-10.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eData Historization: RAID-10 storage ensures secure and reliable logging.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eSoftware-based license, no additional hardware required.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eFunctional Highlights\u003c\/h3\u003e\n\u003cul class=\"list-paddingleft-2\"\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eProvides high-availability architecture for PlantCruise SCADA systems.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eEnsures continuous monitoring and control during server failures.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eCompact license package with minimal shipping footprint.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eMaintains Honeywell’s performance standards with fault tolerance and data protection.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eDesigned for scalability and seamless integration into existing PlantCruise systems.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eApplication Scenarios\u003c\/h3\u003e\n\u003cul class=\"list-paddingleft-2\"\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eIndustrial plants requiring strict uptime and redundancy.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eEnergy and utility facilities needing continuous SCADA monitoring.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eManufacturing environments where failover protection is critical.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003cli\u003e\n\u003cp\u003e\u003cspan\u003eProcess industries requiring scalable redundancy solutions.\u003c\/span\u003e\u003c\/p\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eFAQ\u003c\/h3\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eQ: How many points does the CV-RSC100 add?\u003c\/strong\u003e  A: It expands PlantCruise systems by 100 SCADA points with redundancy.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eQ: What hardware is recommended for optimal performance?\u003c\/strong\u003e  A: 64 GB RAM and RAID-10 SSD storage are recommended for best results.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eQ: How fast is the failover mechanism?\u003c\/strong\u003e  A: Typically less than 300 milliseconds.\u003c\/span\u003e\u003c\/p\u003e\n\u003cp\u003e\u003cspan\u003e\u003cstrong\u003eQ: How does it compare to CV-RSC02K?\u003c\/strong\u003e  A: The CV-RSC100 adds 100 points, while the CV-RSC02K supports 2,000 points, making CV-RSC100 suitable for smaller-scale redundancy needs.\u003c\/span\u003e\u003c\/p\u003e","brand":"Honeywell","offers":[{"title":"Default Title","offer_id":43224352948312,"sku":"CV-RSC100","price":100.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0670\/2039\/0488\/files\/honeywell-cv-rsc100-plantcruise-100-scada-points-redundancy-adder-0ph4rlelkfj.png?v=1758522668","url":"https:\/\/www.industriaxplc.com\/products\/honeywell-cv-rsc100-plantcruise-100-scada-points-redundancy-license","provider":"IndustriaX Limited","version":"1.0","type":"link"}